— Construction Control Loop —

Acceptance
quantity & quality

The layer that produces evidence for output

Site figures are captured, verified and become the official evidence for output, quality, cost and payment. Quality lives inside output — from construction through to acceptance, everything has data, photos and an audit trail.

  • Fast rollout
  • Real data from the site
  • Connected straight through to payment
1
PlanPlan
2
ConstructionBuild
3
OutputAcceptance
4
ReconciliationReconcile
5
Post-checkLearn
— Quality lives inside output —
No acceptance — no output
No quality — no payment
The site
Creating real value
  • GPS-tagged photos
  • Captured in real time
  • Link drawings & locations
  • Traceability & audit
Quantity
How much has been built?
  • Take-off and acceptance by work item
  • Compare plan and actual
  • Backed by drawings, site logs and site photos
Quality
Pass or fail?
  • Quality checklist by work item
  • Acceptance against technical standards
  • Photos, reports, test results
Evidence
Reports, photos, audit trail
  • Electronic acceptance report
  • Photos, video, GPS coordinates
  • A complete audit trail
Tekshot Site Reality → Evidence
From the site to evidence
  • Quick capture on mobile
  • AI image and video analysis, with a stated confidence level
  • Automatically attached to the work item and location
Cost → Value
Acceptance creates value
  • Attach unit prices, estimates and contracts
  • Compute the accepted value
  • Connect actual cost
Reconciliation → Payment
Transparent & on schedule
  • Compare quantity & value
  • Reconcile against the contract
  • It is the basis for the payment file
Post-check → Lessons Learned
Capture the lesson and standardise it
  • Deviation and risk analysis
  • Lessons learned
  • Standardise the process, avoid repeating mistakes
A single data flow

Quantity and quality are captured once and reused for cost, reconciliation, payment and post-check — no re-keying, no mismatched numbers.

See related pages
erpcons.vn/app/acceptance Sample data
Project: Riverside Urban Area › Tower A › Structure › Acceptance
Quantity & quality acceptance
01/04/2024 – 30/04/2024
Accepted output
1,256 m³
+8.6% vs plan
Quality pass rate
98,6%
+1.2% vs prior period
Accepted value
12.8bn
+10.4% vs plan
Report no.
24
100% with photos
Acceptance list · Site photos · Reports & documents · Progress charts · Value reconciliation
No.Work itemLocationQuantityUnitQualityPhotosRecordAcc. dateStatus
1Column C1 concreteLevel 545,2Pass12/04/2024Approved
2Beam D3 rebarLevel 512,6tonnesPass11/04/2024Approved
3Slab formworkLevel 5320Pass10/04/2024Approved
4BlockworkLevel 4186Needs action09/04/2024Awaiting approval

Interface shown with sample data — not real customer data.

Who uses it?

QS

Track quantity, value and payment reconciliation

  • Create the acceptance
  • Compute the value
  • Contract reconciliation
Engineering

Inspect the work and assess quality

  • Technical acceptance
  • Quality checklist
  • Site capture
Site manager

Managing schedule, output and quality overall

  • Acceptance approval
  • Track progress
  • Resolve blockers
QA/QC

Meet the standard, check the reconciliation

  • Check & assess
  • Quality report
  • Non-conformance reports
Trust Layer
A trusted platform for sustainable operations

Security — Transparency — Compliance — Ready to scale

SecurityMulti-layer data security
Data OwnershipData ownership
Audit TrailA complete audit trail
ComplianceLegal compliance
Integration & APIOpen, flexible connectivity
ImplementationImplementation & Training
Support & SLASupport & Commitment

Turn the site into data.
Turn data into value.

Start with the Acceptance Checker for a quick review of your acceptance data.

  • No complicated setup
  • Your data is protected
  • An expert works alongside you