— Construction Control Loop —

How ERPCons connects
the plan to reality

The whole platform runs on a single loop: Plan → Build → Output → Reconcile → Learn. Each step produces data for the next, and the last step feeds back to improve the first.

Connect plan to reality — control output — optimise cost — keep learning
One loop
Nothing breaks the chain

Construction Control Loop

Five main steps run left to right. The three data sources below feeds data into the loop — they are not steps in the process.

1
PlanPlan
2
ConstructionBuild
3
OutputQuantity + Quality
4
ReconciliationReconcile
5
Post-checkLearn
— Quality lives inside Output —
Feeds data into the loop
Site Reality
Powered by Tekshot Vision AI
  • Capture what is actually on site
  • AI image / video analysis
  • Site Reality → Output
feeds into step 3 — Output
Construction Intelligence
Data & Forecasting
  • Price Intelligence (construction prices)
  • Project Intelligence (performance)
  • Site & Cost Intelligence
feeds into Cost & Forecasting
CDE
Common Data Environment
  • Standard data — one trusted source
  • Documents · Drawings · Contracts · Logs
  • Process — Approval — Evidence
across all 5 steps

Five steps, explained in detail

Step 1
Plan

Decide what has to be done, for how much, and by when.

Includes:
  • Estimate & BOQ
  • Resource plan
  • Progress by WBS
Produces: the reference every later step is checked against
Step 2
Construction

Build it on site and record what happens.

Includes:
  • Apply the construction method
  • Site logs and photos
  • People, equipment, materials
Produces: raw data about what is happening on site
Step 3 — the centre
Output

Quantity + Quality. This is the layer that turns reality into official evidence.

Includes:
  • Internal acceptance
  • Reports & GPS-tagged photos
  • Quality check results
Produces: the evidence for computing value and payment
See the Output page
Step 4
Reconciliation

Reconcile what has been accepted against what has been approved for payment.

Includes:
  • Contracts & addenda
  • Accepted value vs payment
  • Variance & approval
Produces: the list of deviations to resolve
Step 5
Post-check

Review everything, find the root cause and standardise the lesson.

Includes:
  • Deviation analysis
  • Root cause
  • Lessons & standardisation
Produces: better input for Step 1 of the next project
See the Post-check page
A loop, not a straight line

Step 5 feeds back into Step 1. This is what sets apart Construction Control from ordinary project management software: the system does not just record what happened, it uses that data to make the next project run better than the last.

Why is Output at the centre?

The three commercial links have to be told as one flow: Output → Cost → Reconciliation. Output is the only layer that produces evidence; the other two layers merely convert and reconcile that evidence.

No acceptance — no output.
No quality — no payment.
Output

Quantity + Quality. Record the acceptance result and produces the evidence.

Cost

Convert the accepted quantity into value.

Reconciliation

Reconcile the acceptance against the payment, points to the deviation.

Post-check

Re-check the completeness and validity of the evidence pack.

The sitephotos, logs, measurements
Evidencethe acceptance report
Valuequantity × unit price
Paymentthe part approved
Trust Layer
A trusted platform for sustainable operations

Security — Transparency — Compliance — Ready to scale

SecurityMulti-layer data security
Data OwnershipData ownership
Audit TrailA complete audit trail
ComplianceLegal compliance
Integration & APIOpen, flexible connectivity
ImplementationImplementation & Training
Support & SLASupport & Commitment