Packaged around the problem,
not the number of menus
You do not have to buy all 18 business domains from day one. ERPCons packages around the scope you genuinely need to control first, then expands once the value is proven.
- We do not compete on being cheap
- Subscription and implementation fees stated separately
- Expand on progress, not on a contract
The package structure below follows the strategy document. Specific figures have not been released because it needs a commercial decision: whether to publish enterprise pricing, and where the project / user limits sit between packages.
Product & Sales to confirm: unit of measure (project / user / contract value) · price per package · which packages are public and which go through discovery.
Four ways to package
The difference is in the scope of control, not in unlocking extra minor features.
Project
For businesses that want to control one flagship project before expanding.
- 01 project
- Quantity & quality acceptance
- Cost & Reconciliation
- Documents & Records (CDE)
- Site app
Business
For contractors running several projects in parallel who need to compare across them.
- Many projects, one portfolio
- Everything in the Project package
- Procurement · Warehouse & Logistics
- Multi-project reports & dashboards
- Site Reality (optional)
Enterprise
For main contractors and groups rolling out organisation-wide with their own compliance requirements.
- All 14 business domains
- Full Construction Intelligence
- Permissions and workflows to match your organisation
- Integrate with your existing ERP / accounting
- Dedicated SLA and support
Platform / Custom
When you need ERPCons as a data platform with your own development on top.
- API & Integration hub
- Specialised business configuration
- A dedicated environment on request
- A long-term development partnership
Two cost lines, kept separate
Many ERP projects fail because these two lines are merged and the budget blows up during implementation. We separate them right in the quote.
A recurring fee to use the platform.
- Priced on the scope you choose
- Includes infrastructure updates and operations
- Predictable, budgeted annually
A one-off cost to get the system into operation.
- Discovery and configuration to fit your process
- Data migration, legacy system integration
- Training and support through the early phase
Land → Prove → Expand
Our commercial approach is to expand on proven results, not on a contract signed once up front.
Because an organisation cannot absorb 18 changes at once. Going too broad too early is the most common reason construction ERP projects fail.
Questions about cost
If your question is not here, book a call — we will answer for your specific size and situation.
Book a callSecurity — Transparency — Compliance — Ready to scale
Start small and measurable
A 45-minute discovery session is enough to define the right scope and give you a concrete quote.